Gold Member Since 2011
Audited Supplier
Taizhou Remo Plastic Mould Co., Ltd.

Turnover Box Mould, Plastic Crate Mold, Plastic Turnover Box Mould manufacturer / supplier in China, offering RM0301054 Turnover Box Mould / Box Mould / Crate Mould, Square Type Airtight Clear Food Storage Box Mould, Tata Dashboard Plastic Injection Mould and so on.

(/ )

Supplier Homepage Product Crate Mould RM0301054 Turnover Box Mould / Box Mould / Crate Mould

RM0301054 Turnover Box Mould / Box Mould / Crate Mould

FOB Price: Get Latest Price
Min. Order: 1 Set
Port: Ningbo, China
Production Capacity: 100 Sets/Month
Payment Terms: T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: RM0301054
  • Surface Finish Process: Polishing
  • Plastic Material: HDPE
  • Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
  • Design Software: UG
  • Standard: DME
  • Name: Crate Mould
  • Hot Runner Brand: Chinese / Yudo / Hasco / etc..
  • Molding Type: Injection Molding
  • Mould Material: P20 / 718 / 2738
  • Polish: Mirror Polish
  • Trademark: REMO
  • Specification: International Standard
  • HS Code: 84807190
  • Shaping Mode: Injection Mould
  • Mould Cavity: Single Cavity
  • Process Combination Type: Compound Die
  • Runner: Hot Runner
  • Installation: Semi Fixed
  • Customized: Customized
  • Runner System: Hot Runner
  • Cooling: Water Cooling
  • Mould Life: 1,000,000 Shots
  • Base Material: 45# Steel
  • Sample Time: 45-60 Days According to Sample Size/Shape
  • Transport Package: Wooden Case
  • Origin: Taizhou China
Product Description
Turnover box mould
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products, including crate mould
RM0301054 Turnover Box Mould / Box Mould / Crate Mould
RM0301054 Turnover Box Mould / Box Mould / Crate MouldOur advantages:
1. Long life with high quality imported material
2. Special hot runner system for plastic recycled material
3. Hydraulic cylinders + stripper plate design to ensure a better and steady production
4. Multi cavity mould design
5. Punctual sample time / mould leadtime
6. Logistic service available
Business Step 
1. R& DWe support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design 3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery Delivery goods by sea or by air, according  customers requirement 
Send your message to this supplier
Avatar
Mr. Totti
Sales Manager
*From:
To: Mr. Totti
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now