Gold Member Since 2011
Audited Supplier
Taizhou Remo Plastic Mould Co., Ltd.

Oven Box Mould, Box Mould, Microwave Oven Box Mould manufacturer / supplier in China, offering 2 Cavity Oven Box Mould, 120 Degree Elbow Pipe Fitting Mould, PPR Pipe Fitting Injection Mould and so on.

(/ )

2 Cavity Oven Box Mould

FOB Price: US $1 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1/ Piece
Get Latest Price
Production Capacity: 100 Sets/Month
Transport Package: Wooden Case
Payment Terms: L/C, T/T, D/P

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: RM0301028
  • Process Combination Type: Compound Die
  • Installation: Fixed
  • Cavity Nos: 1 / 2 / 4
  • Mould Material: P20/718/2316/2738etc.
  • Mould Base: 45#
  • Ejector System: Stripper Plate
  • Delivery Time: 1-2 Months
  • Specification: International Standard
  • HS Code: 84807190
  • Shaping Mode: Injection Mould
  • Application: Commodity
  • Name: Oven Box Mould
  • Mould Life: 1,000,000 Shots
  • 3D Design: Solidworks / PRO-E
  • Cooling System: Water Cooling
  • Hot Runner System: Chinese / Yudo / Hasco / Husky
  • Trademark: REMO
  • Origin: Taizhou China
Product Description
TaiZhou Remo Plastic Mould Co.,Ltd is a professional mould manufacturer , we are specialized in making various injection moulds including microwave container & lid moulds. Mould cavity numbers can be 1 ,2 or 4 cavity as customer's requirements.

Our moulds have below advantages:
1. Professional product&mould design
2. Special cooling effects
3. Special Hot runner design
4. Fast cycle time
5. Punctual delivery time
6. Sample available

Business Step 
1.R&D We support customer R&D. Make the files or improve the design if you needed 
↓↓↓
2.Quotation Making Mould Quotation will be finished in  1  day according to information we get
↓↓↓
3.Negotiation  The quality ,price ,material,delivery time .payment item.ect 
↓↓↓
4.Mould Design  3-5  days for mould and product 3D/2D drawing design
↓↓↓
5.Mould According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in  25-60  days 
↓↓↓
6.Mould Testing When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will  send samples  for consumers' reference.
↓↓↓
7.Sample shoot  If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory 
 ↓↓↓ 
8.Delivery  Delivery goods by  sea  or by  air  ,according  customers requirement 

Send your message to this supplier
Avatar
Mr. Totti
Sales Manager
*From:
To: Mr. Totti
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now