Zhejiang, China
Business Type:
Manufacturer/Factory
Main Products:
Number of Employees:
122
Year of Establishment:
2011-03-02
Import & Export Mode:
Have Own Export License
OEM/ODM Service
Sample Available

Toy Car Wheel Mould, Toy Car Wheel Mold, Plastic Toy Car Wheel Mould manufacturer / supplier in China, offering Toy Car Plastic Wheel Part Mould, Plastic Thin Wall Cup Injection Mould (RM0301078), Auto Part Mould with Yudo Hot Runner and so on.

Gold Member Since 2011
Audited Supplier

Toy Car Plastic Wheel Part Mould

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $5,000-1,000,000/ Piece
Production Capacity: 25 Sets/Month
Transport Package: Wooden Case
Payment Terms: T/T, Paypal, Western Union
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Plastic Material: PP,PE,ABS,etc
Process Combination Type: Progressive Die
Application: Car, Commodity

You Might Also Like

Loading...

Basic Info

Model NO.: REMO-TOY 01
Runner: Cold Runner
Design Software: UG
Installation: Semi Fixed
Standard: as Requirement
Customized: Customized
Mould Base: Lkm,Hasco,etc
Mould Runner: Hot/Cold Runner
Injection Gate: Sub-Gate
Trademark: REMO
Specification: AS REQUIREMENT
Origin: Taizhou China
HS Code: 8480719090

Product Description

Toy Car Wheel Mould

As a professional plastic mould manufacturer in China, we are specialized in
Opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc.
Mould Base LKM, HASCO etc.

Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA etc.
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA etc.

Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step
1. R& DWe support customer R& D. Make the files or improve the design if you needed
↓ ↓ ↓
2. Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. NegotiationThe quality, price, material, delivery time. payment item. ect
↓ ↓ ↓
4. Mould Design3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days
↓ ↓ ↓
6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shootIf the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory
  ↓ ↓ ↓ 
8. DeliveryDelivery goods by sea or by air, according  customers requirement


FOR MORE DETAILS,WELCOME TO SEND US AN INQUIRY.

Send your message to this supplier

*From:
*To:
avatar Miss Skye
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now