Zhejiang, China
Business Type:
Manufacturer/Factory
Main Products:
Number of Employees:
122
Year of Establishment:
2011-03-02
Import & Export Mode:
Have Own Export License
OEM/ODM Service
Sample Available

Turnover Box Mould, Plastic Crate Mold, Plastic Turnover Box Mould manufacturer / supplier in China, offering RM0301054 Turnover Box Mould / Box Mould / Crate Mould, Plastic Thin Wall Cup Injection Mould (RM0301078), Auto Part Mould with Yudo Hot Runner and so on.

Gold Member Since 2011
Audited Supplier
Supplier Homepage Products Crate Mould RM0301054 Turnover Box Mould / Box Mould / Crate Mould

RM0301054 Turnover Box Mould / Box Mould / Crate Mould

Get Latest Price
Min. Order: 1 Set
Port: Ningbo, China
Production Capacity: 100 Sets/Month
Payment Terms: T/T
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Plastic Material: HDPE
Process Combination Type: Compound Die
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware

You Might Also Like

Loading...

Basic Info

Model NO.: RM0301054
Runner: Hot Runner
Design Software: UG
Installation: Semi Fixed
Standard: DME
Customized: Customized
Name: Crate Mould
Runner System: Hot Runner
Hot Runner Brand: Chinese / Yudo / Hasco / etc..
Cooling: Water Cooling
Molding Type: Injection Molding
Mould Life: 1,000,000 Shots
Mould Material: P20 / 718 / 2738
Base Material: 45# Steel
Polish: Mirror Polish
Sample Time: 45-60 Days According to Sample Size/Shape
Trademark: REMO
Transport Package: Wooden Case
Specification: International Standard
Origin: Taizhou China
HS Code: 84807190

Product Description

Turnover box mould
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products, including crate mould
RM0301054 Turnover Box Mould / Box Mould / Crate Mould
RM0301054 Turnover Box Mould / Box Mould / Crate MouldOur advantages:
1. Long life with high quality imported material
2. Special hot runner system for plastic recycled material
3. Hydraulic cylinders + stripper plate design to ensure a better and steady production
4. Multi cavity mould design
5. Punctual sample time / mould leadtime
6. Logistic service available
Business Step 
1. R& DWe support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design 3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery Delivery goods by sea or by air, according  customers requirement 

Send your message to this supplier

*From:
*To:
avatar Mr. Totti
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now